IIIOrganization & Project ManagementGuide

Standardize Your Quoting Process: Templates, Building Blocks, Approvals

Most quotes consist largely of things that have already been written, costed, and checked. Still, every time someone starts almost from scratch.

Antique desk with three drawers
Photo: MChe Lee / Unsplash

Key takeaways

  • You standardize what recurs: structure, service descriptions, costing assumptions, and the question of who approves.
  • The three-level kit consists of a template, maintained building blocks, and an approval rule based on value and risk.
  • A standard is a model that allows deviation. A rigid rulebook gets worked around in sales.
  • Success is measured by two numbers: days from inquiry to quote and the share of quotes won.

Why does a quote take so long when most quotes look alike?

An inquiry comes in, the salesperson looks for an old quote for a similar customer, copies it, changes names and quantities, and sends the costing to engineering. There it sits until someone has time. Then the draft waits for the owner's approval. In the end the quote has taken a week, even though three quarters of it is familiar material.

The problem is rarely the individual. What is missing is a shared foundation. Every salesperson has a favorite template, service descriptions exist in five versions, and which prices applied last time is known only to whoever wrote the last quote. Every quote becomes a small one-off project.

This costs twice. It costs time, and it costs orders, because a customer who waits a week has also talked to other suppliers during that week. How a quote convinces in terms of content is covered in the article on quotes that win. This article is about how to get there, and the guiding question is: how is a quote produced quickly, completely, and without follow-up questions? To answer it, we first clarify what standardizing means here, then go through the three levels of template, building blocks, and approval, and end with findings from research and a four-week plan.

A quote that is three quarters familiar material should not take as long as a new development.

Two ways of producing a quote

Every quote by hand

  • Find an old quote, copy it, adapt it
  • Service texts in several versions
  • Costing depends on one person
  • Every quote waits for the owner

Quote from the kit

  • One template with a fixed structure
  • Maintained building blocks with an owner and a date
  • Costing assumptions stored with each block
  • Approval only where value or risk require it

What does it mean to standardize the quoting process?

The quoting process covers everything between an inquiry arriving and the quote going out: clarifying the need, defining the scope, costing, writing, checking, approving, sending, and setting a follow-up date. Standardizing means doing the recurring parts well once and then reusing them again and again.

This article uses the three-level kit for that purpose. It separates what is always the same from what changes with each customer. Each level has its own purpose and can be introduced on its own.

  1. Level 1: The template

    A fixed structure for all quotes, with sections that always appear in the same order. It makes sure nothing is forgotten.

  2. Level 2: The building blocks

    Maintained texts and costing assumptions for services that come up again and again. They make sure nobody rewrites what has already been phrased well.

  3. Level 3: The approval rule

    A clear threshold for the value or risk at which someone else checks the quote. It makes sure that only the quotes where it matters have to wait.

What does not get standardized matters just as much: clarifying the need, choosing the right building blocks, and the part of the quote that addresses the customer's situation. That is the salesperson's real work, and that is where their time should go.

Level 1: What does a good quote template look like?

A template sets the order and reminds you of every section. It is not a form to fill in. A structure that starts with the customer and ends with the next step has proven useful.

Structure of a quote template and where the content comes from
SectionContentSource
Starting pointWhat the customer wants to achieve, in their wordsMeeting notes, individual
SolutionWhat you propose and whyBuilding blocks plus one individual paragraph
Scope and exclusionsWhat is included and what is explicitly notBuilding blocks
PriceLine items, total, payment termsCosting assumptions of the blocks
ScheduleStart, duration, underlying assumptionsCheck with the delivery team
Next stepValidity, contact person, date for discussing the quoteTemplate

Two sections are forgotten most often in practice: the exclusions and the assumptions behind the schedule. Both cause most of the questions later, when the quote turns into an order. What has to be recorded at that handoff is described in the article on the handoff from sales to the project team.

Level 2: Which quote building blocks are worth creating?

A building block is a self-contained part that appears in many quotes: the description of a service with scope, exclusions, and costing assumption, a section on warranty and service, or a short reference. Start with the services quoted most often in recent months. In many companies five to ten blocks cover the largest share.

  • Every block has an owner who keeps it up to date.
  • Every block carries the date of its last review.
  • Service text and costing assumption sit together, so that price and description do not drift apart.
  • The exclusions are in the block and not in the salesperson's head.
  • There is exactly one valid version; older ones are archived.
  • A block is short enough that a customer actually reads it.

Building blocks are a model, not a constraint. A salesperson may adapt them when the customer requires it. They should simply know what they are deviating from. A comparison of two sales departments in Japan (Hanahara, 2026) shows why this distinction matters. Both wanted to make sales less dependent on individuals and enrolled in the same training program. A travel agency developed a shared basic pattern for sales conversations and practiced it in role-plays. A manufacturer of specialized equipment for the healthcare sector wrote detailed standard operating procedures. In the first company the salespeople afterwards worked along the shared process. In the second there were short-term gains, but selling based on personal skill prevailed again. These are two cases and not a measurement, but they support a simple rule: a standard has to be practiced and has to leave room.

Level 3: Who approves which quote?

In many small companies every quote crosses the owner's desk. That safeguards quality but makes the owner the bottleneck. The solution is an approval rule that distinguishes by value and risk. The article on process before tool describes the underlying idea: a rule replaces the individual decision.

Example of an approval rule with three levels
LevelApplies toApproved byDeadline
StandardBuilding blocks only, value up to €10,000, no discountnobody, the salesperson sends itimmediately
ExtendedDeviation from blocks or discount up to 5%sales lead or an experienced colleague1 business day
Special caseValue above €10,000, new service, contractual penaltiesowner2 business days

Worked example

The amounts are freely chosen. Set your own thresholds so that roughly two thirds of quotes can go out without approval. The deadline is important: an approval that takes longer than two business days is a bottleneck and should come up in the weekly meeting.

Average days from inquiry to quote, before and after introducing the kit
  • Before, all quotes8 days
  • After, standard level2 days
  • After, extended level4 days
  • After, special case6 days

Worked example: the time savings arise mainly with standard quotes, because searching, rewriting, and waiting for approval drop out.

What does research say about the quoting process?

Surdziel and Gdowska (2026) accompanied a mid-sized Polish IT consulting firm whose presales phase ran informally and kept drifting away from the intended process. The researchers conducted twelve interviews and two workshops with sales, technical, finance, and delivery teams. Because no performance data existed, they estimated the baseline values from several sources. The result: a share of quotes won of about 25 percent and an average of 14 days until the customer received a response.

approx. 25%quotes won, estimated baseline
14 daysaverage response time before
≥ 35%target for quotes won
≤ 10 daystarget for response time

Source: Surdziel and Gdowska (2026)

What changed was mainly the organization. The company created a dedicated presales department, clarified roles, and brought in technical expertise early. Simple tools supported coordination and learning: process models, a form for project barriers, and a form for analyzing won and lost quotes. The authors report less drift in the process, better collaboration, and more visibility for management. It is a single case with estimated baselines, and the targets had not yet been measured at the time of the study. It is notable that the improvement required no new software.

Companies that build to customer specifications face an additional difficulty. Ohlson and Bäckstrand (2026) studied five Swedish companies of this kind. In the quoting phase, delivery time, cost, and required capacity have to be estimated before an order is certain. Standardization and customization stand in a tension that, in the authors' view, cannot be resolved, only balanced continuously. A literature review by Bhalla, Alfnes, and Hvolby (2023) reaches a related finding: research stresses how important coordination and fixed rules are when committing to delivery dates, but gives practitioners little guidance on how to achieve them.

A final point concerns price. Agrawal and Ferguson (2007) use industry data to show how pricing models can be derived from previous quotes and their outcomes. For a small company such a model is usually too elaborate. The prerequisite for it is valuable on a small scale too: a list of all quotes with price, outcome, and reason. How to analyze lost quotes is described in the article on analyzing lost deals.

How do you introduce the standard in four weeks?

  1. Collect quotes

    Take the quotes from the last three to six months and mark sections that appear repeatedly.

  2. Set the template

    Build a structure with fixed sections from the best quotes. One page of outline is enough.

  3. Write five to ten building blocks

    Start with the most frequent services. Every block gets an owner, a date, and a costing assumption.

  4. Agree on the approval rule

    Set thresholds by value and risk and a deadline for each level.

  5. Test and measure for four weeks

    Measure the days to the quote and note where blocks were missing. Adjust afterwards.

You can map the workflow itself, from inquiry to follow-up, beforehand using the template from the article on how to visualize your sales process. Only once the kit works by hand is a tool worthwhile that assembles quotes from blocks or reminds you to follow up. More on that under automating sales.

What you can do this week

  1. Count the days from inquiry to dispatch for your last ten quotes.
  2. Put three of these quotes side by side and mark what appears more than once.
  3. Write the building block for your most frequent service, with scope, exclusions, and costing assumption.
  4. Draft an approval rule with two thresholds and discuss it with the team.
  5. Decide who maintains the blocks and when they will next be reviewed.

With that, the core of the kit is in place. Every further block saves time from the next quote onward, and the approval rule gives you as the owner hours back that you need for the quotes where it really comes down to you.

Back to the opening question, which was how a quote is produced quickly, completely, and without follow-up questions. The answer is a kit with three levels: a fixed template, maintained building blocks for what recurs, and an approval rule based on value and risk. It only works as a model that allows deviation, and whether it works is shown by two numbers: the days until the quote and the share of quotes won.

Frequently asked questions

How can I speed up creating quotes?

Separate what recurs from what is individual. A fixed template, maintained service building blocks, and an approval rule based on value and risk save searching, rewriting, and waiting time. The time for clarifying the customer's need is preserved.

What belongs in a quote template?

The customer's starting point, the proposed solution, scope and exclusions, price with payment terms, schedule with assumptions, and the next step with validity. The order always stays the same so that nothing is forgotten.

Does every quote have to be approved by the boss?

No. An approval rule defines the value or the deviations at which someone checks. Standard quotes built from reviewed blocks can go out without approval. That way only what carries real risk has to wait.

How many text building blocks do I need for quotes?

Five to ten to start with, for the services quoted most often. Maintenance matters more than the number: every block needs an owner, a review date, and exactly one valid version.

Doesn't a standard make quotes interchangeable?

Only if the individual part is missing. The starting point and the reasoning behind the solution are written anew for every customer. The standard takes over the routine work so that more time remains for that part.

Sources

  1. Surdziel, M.; Gdowska, K. (2026): From Process Drift to Shared Ownership in a BPM Case Study of Presales Transformation in an IT Consulting SME. Research on Enterprise in Modern Economy (REME): Theory & Practice, 1(42), 5-20.
  2. Ohlson, N.-E.; Bäckstrand, J. (2026): The planning paradox: Why engineer-to-order companies must embrace contradictions in tactical planning. Production Planning & Control, advance online publication, 1-22.
  3. Bhalla, S.; Alfnes, E.; Hvolby, H.-H. (2023): Tools and practices for tactical delivery date setting in engineer-to-order environments: a systematic literature review. International Journal of Production Research, 61(7), 2339-2371.
  4. Hanahara, A. (2026): Standardization Efforts in Two Sales Departments: The Role of Kata Versus SOPs. Annals of Business Administrative Science, 25(3), 35-53.
  5. Agrawal, V.; Ferguson, M. (2007): Bid-response models for customised pricing. Journal of Revenue and Pricing Management, 6(3), 212-228.

All sources in the knowledge base

Reading room of a historic library with galleries, walls of books, and a skylight